Latest News
Breaking news and real-time updates from the ASX small-cap market

Dateline Resources Defines Heavy Rare Earth Targets at Music Valley Project
Dateline Resources defines three priority HREE targets at Music Valley after magnetic-radiometric surveys; fieldwork and drill targeting underway.

Critical Minerals Group Targeting Data Centre Boom with Integrated 'Mine-Battery Grade Vanadium Electrolyte (VE)'
Critical Minerals Group shifts from explorer to mine-to-battery vanadium supplier, targeting data-centre storage with a VE battery electrolyte plant in Qld.

Turaco Gold Completes Pre-Feasibility Study for Afema Gold Project
Turaco Gold backs Afema PFS: ~200 koz/yr over 10.3 years, US$410m capex; IRR ~60% at US$3k/oz; definitive study 2027, first gold 2029.

RocketDNA Simplifies Group Structure with Full Acquisition of WA Subisidiary
RocketDNA to acquire remaining 40% of RocketDNA WA, reaching 100% control via $1m in new shares; no operational impact, but posts positive cash flow ($62k).

Stealth Group Holdings Builds Record FY26 Platform For $500m Sales Push
Stealth Global flags record FY26 as it lifts platform with HBT to ~1,200 stores; forecast FY26 sales at $165m, EBITDA $14.3m, NPAT $5.8m; targets $500m by FY28.

Norwood Systems Initiates OpenSpan Paid Pilot Trial with Major UK Teleco Provider
Norwood Systems to trial OpenSpan with a major UK telco in a paid pilot, $285k upfront potential; Azure-based AI voice services could unlock growth (NOR).

Hillgrove Resources Reports High-Grade Assays from Kanmantoo’s Emily Star Copper-Gold Lode
Hillgrove Resources reports high-grade copper-gold assays from Emily Star at Kanmantoo as Stage 2 moves toward FID.

AIC Mines Flags Jolly as First Mining Zone at Jericho Copper Project
AIC Mines flags Jolly as Jericho's first mining zone after high-grade drilling, signaling near-term development ahead of the Eloise plant expansion.

White Cliff Minerals Identifies New High-Grade Copper Zone at Rae Project
White Cliff Minerals uncovers new high-grade copper zone at Rae/Danvers: 79.24m @1.59% Cu, incl 24.38m @3.05%; Danvers system >3.1km strike; second rig on site.

Southern Cross Electrical Engineering Completes $150m Institutional Placement
Southern Cross Electrical Engineering to raise $150m via fully underwritten institutional placement at $4.00/sh; settlement June 19, SPP opens.

Encounter Resources Ramps Up 70,000m Drill Program at Aileron Project in WA
Encounter Resources ramps 70,000m Aileron drill program as niobium-REE project advances; mining lease lodged.

Nanoveu Demonstrates Microphone-Free Keyword Capture on ECS-DoT Chips for Wearable Devices
Nanoveu's EMASS demos microphone-free keyword spotting on ECS-DoT chips at under 1mW, bone-conduction wake words for ultra-low-power wearables.